Cyclists Keep Right Symbol Preformed Thermoplastic Marking - 750mm Photo 1 of 2

Cyclists Keep Right Symbol Preformed Thermoplastic Marking - 750mm

In stock SKU SCU12576
£186.19incl. VAT
Symbol Size: 750mm
Need help choosing the right product?Our UK team answers Mon–Fri 08:30–17:00

Specification for the selected option

Symbol Size: 750mm

Certifications
ConformsBS EN 1871
Material
TypeThermoplastic
ColourBlue/White
Dimensions
Diameter750mm
Specifications
ApplicationIf using glass bead, 250g of glass bead per square metre
Secure checkoutAmerican Express Apple Pay Diners ClubDiscoverGoogle Pay KlarnaMaestroMastercard Shop Pay Union PayVisa

Clear cyclists keep right roundel for shared pedestrian and cycle routes.

This preformed thermoplastic road marking organises shared paths by instructing cyclists to keep to the right-hand side of divided routes. Manufactured with factory-embedded glass beads for skid resistance, it melts directly onto the pavement using a standard gas torch to deliver a durable, professional finish.

Key Features

  • Pre-cut preformed thermoplastic for straightforward application
  • Factory-embedded glass beads provide immediate slip resistance
  • Professional appearance with crisp, pre-formed edges
  • Rapid installation requiring only a clean surface and a gas burner
  • Fully conforms to BS EN 1871 standard
  • Compatible with top-dressed glass beads for extra traction

Specifications

  • Material: Preformed thermoplastic
  • Roundel diameter: 750mm x 750mm
  • Alternative dimensions: 1200mm x 1200mm, 2500mm x 1500mm, 4300mm x 1500mm
  • Compliance: BS EN 1871
  • Application surface temperature: 5°C to 40°C
  • Primer requirement: 200ml/m² to 400ml/m² on concrete or aged asphalt

Installation Guidance

  • Substrate must be completely dry and clear of dust, loose debris, oil, and salt
  • Apply primer to concrete surfaces or aged, oxidised tarmac before placing the roundel
  • Position the marking bead-side up and apply heat evenly until fully bonded to the surface
  • Application to block paving is not recommended due to inter-block movement and moisture causing premature cracking

Applications

  • Shared pedestrian and cycle pathways with central dividing lines
  • Urban cycle tracks and municipal footways
  • Parks, greenways, and leisure trails
  • University and school campus grounds
  • Commercial and business park access paths

Quote for this product

This product is added to your request automatically. Add quantities and anything else you need for the same site.

Selected: 750mm
750mm